Loading contract…
BETAThis is a new independent transparency project, not an official government website. The data is sourced from public registers and may contain errors, so always verify against the official source. If you find a problem, please report it here.
The existing boilers, shunt pump, circuit pumps, controls and F&E tank are to be stripped out and the pipework is stripped back to a prior to it exiting the boiler room. The boilers are replaced with two new wall mounted boilers, the flues with the boilers are concentric so can terminate through the boiler room roof.
| Supplier | Identifier | Award Value | Lots Won | Cross-References |
|---|---|---|---|---|
| D H Potter Construction Limited | 11023823 | - | 1 lot Lot 1 | - |
This procurement was divided into 1 lots, each awarded separately.
| Lot | Value | Awarded To | Status |
|---|---|---|---|
| Lot 1 | - | D H Potter Construction Limited | active |