It is the intention of the Client to appoint a Principal Contractor to take the designs identified in Appendix A and attached to the ITT through to completion and to accept the full design liability for the project
During any works it must be stressed that all areas around the site will remain live and the protection of non-construction personnel is of the highest priority.
| Supplier | Identifier | Award Value | Lots Won | Cross-References |
|---|---|---|---|---|
| The HUB Build Limited | 05629190 | £355,555 | 1 lot Lot 1 | - |
This procurement was divided into 1 lots, each awarded separately. 4 bids were received in total.
| Lot | Value | Bids Received | Awarded To | Status |
|---|---|---|---|---|
| Lot 1 Sept 2025 – Dec 2025 | £800,000 £355,555 initial term | 4 | active |
Weightings from the notice.