BETAThis is a new independent transparency project, not an official government website. The data is sourced from public registers and may contain errors, so always verify against the official source. If you find a problem, please report it here.
Braintree District Council (BDC) is seeking to engage with the market to receive feedback on various aspects of this future opportunity to ensure that it is understood by the market and is fully deliverable. Expressions of Interest are also required.
The Contractor will carry out a programme of maintenance, repairs and replacement of specialised equipment, that are essential for the plant and systems of the Braintree Enterprise Centre, The Plaza Enterprise and Innovation Centre, Saunders House and Osier House to the standards outlined in SFG20 guidance for each individual building service.
The Contractor will provide fully trained engineers and staff to attend the premises and a comprehensive 24hr/365 days per year emergency breakdown service. The scope of this procurement includes the holding of adequate stocks of supplies, including a critical spares list, keeping records of maintenance, servicing, repairs, replacements and breakdowns
There is potential for sites to be removed from the contract throughout the duration of the contract if they are sold.
Further information can be found in the document repository in the Delta e-sourcing portal.
It is anticipated that only one Contractor will be appointed, who will be expected to be capable of providing all aspects of the specification either directly or via subcontractors managed by them.
For more information about this opportunity, please visit the Delta eSourcing portal at:
https://www.delta-esourcing.com/tenders/UK-UK-Braintree:-Repair-and-maintenance-services./63RBY3V63B
To respond to this opportunity, please click here:
Preliminary market engagement notice (UK2). The buyer wants to talk to suppliers before designing the procurement. Taking part is how to shape it.
Bids are submitted through the buyer’s own portal, not on this site. Read the full notice on Find a Tender before relying on any date here.
No supplier information available.
This procurement was divided into 1 lots, each awarded separately.
| Lot | Value | Status |
|---|---|---|
| Lot EPP0199 Dec 2025 – Dec 2028 | - | planning |