The London Borough of Hillingdon ('the Council') has commenced a review of the Local Plan and is seeking to undertake a Green Belt Assessment to support the development of its Local Plan.
The primary purpose of this Green Belt Assessment is to identify which parts of the Green Belt may be suitable for release. This would include identifying both previously developed land within the Green Belt and Grey Belt.
Where land is recommended to be defined as previously developed and/or Grey Belt, a subsequent assessment will be required to determine the extent to which (if at all) the site should be re-categorised as Metropolitan Open Land or Local Open Space.
If these are not appropriate, then recommendations will be provided on the existing Green Belt boundaries, site capacity and for what uses (if any) any released land would be a sustainable location for.
| Supplier | Identifier | Award Value | Lots Won | Cross-References |
|---|---|---|---|---|
| Armour Construction Consultants | 12086068 | - | - | - |
| Brown + Wallace | SO305695 | - | - | - |
| Carbon Futures | - | - | - | - |
| Cowal Design Consultants | SC291036 | - | - | - |
| design-me | - | - | - | - |
| ECD Architects Ltd | 03028104 | - | - | - |
| Forbes Leslie Network Ltd t/a FLN Consulting Engineers | - | - | - | - |
| G3 CONSULTING ENGINEERS LTD. | SC298952 | - | - | - |
| Hardies Property & Construction Consultants | - | - | - | - |
| Hawthorne Boyle Limited | SC481433 | - | - | - |
| Hoare Lea | OC407254 | - | - | - |
| Hulley and Kirkwood Consulting Engineers Ltd | SC132484 | - | - | - |
| LAND USE CONSULTANTS LIMITED | 02549296 | - | 1 lot Lot 1 | - |
| Langmuir & Hay | - | - | - | - |
| OCCAM Architecture Ltd | SC526782 | - | - | - |
| Thomas C Stewart LLP trading as TCS Construction Consultants | - | - | - | - |
| Thomson Gray | SC270835 | - | - | - |
| WGM Consulting Engineers | - | - | - | - |
| Wylie Shanks Architects LLP | SO300091 | - | - | - |
This procurement was divided into 1 lots, each awarded separately.
| Lot | Value | Awarded To | Status |
|---|---|---|---|
| Lot 1 Sept 2025 – Dec 2025 | £87,104 initial term | active |