The purpose of the scheme is to upgrade the existing culvert system, upgrade pipe sizes and improve alignment at Croes y Waun and create an open channel cut off drain that directs overland flows to the culverts.
| Supplier | Identifier | Award Value | Lots Won | Cross-References |
|---|---|---|---|---|
| OBR Construction Ltd | Procurement ID: PCWL-8223-NPZL | £180,000 | 1 lot Lot 1 | - |
This procurement was divided into 1 lots, each awarded separately. 3 bids were received in total.
| Lot | Value | Bids Received | Awarded To | Status |
|---|---|---|---|---|
| Lot 1 Sept 2025 – Dec 2025 | £180,000 £236,448 initial term | 3 | OBR Construction Ltd | active |