The Bakerloo Line runs through London from Harrow & Wealdstone, in the North, to Elephant & Castle in the centre with plans to extend South as part of the Bakerloo Line Extension initiative. The Bakerloo line fleet (72 Tube Stock) is now the oldest rolling stock operating in the UK with considerable costs to life-extend the fleet and significant risks to reduction in reliability. TfL therefore intends to introduce the new rolling stock onto the Bakerloo Line. The BLU Stage 1 Infrastructure works are required modify and upgrading the line's infrastructure to enable the introduction of the new rolling stock with the works expected to completed by, circa 2034. The core elements of the scope include:
This is a refinement of the scope presented during TfL's previous 2024 BLU Early Market Engagement with the current scope having moved the cleaning shed from London Road to Stonebridge Park and no longer required the cleaning shed at the front end of the programme. .
A high-level summary of assets within the scope of this works is provided below:
TfL are currently envisioning three competitions to deliver the scope. These three competitions are to appoint a:
1. Depots and Sidings Partner
2. Waysides Partner
3. Integrator
No supplier information available.
This procurement was divided into 1 lots, each awarded separately.
| Lot | Value | Status |
|---|---|---|
| Lot 1 Jul 2027 – Dec 2034 | - | planned |
Changes the buyer published to this notice after it first appeared.
Updated the SAP Ariba TfL registration link
Please note the date of the supplier industry day has been moved from 24th March to 29th April. Additionally the maximum number of attendees per organisation at the supplier industry day has been changed from 3 to 2.