The University is the single occupier of the Maxwell Building. The building houses professional services, teaching space and a canteen on the ground floor. The building is located centrally on the Peel Park campus and is the main campus reception. The WCs within scope include a Female WC located on the 4th Floor and a Male and Accessible WC on the 9th Floor.
Overview of Works
The scheme will be completed during the normal works hours of Monday to Friday 07:30 - 18:00. The building will be fully occupied for the duration. The contractor should detail within their methodology response, how they intend to minimise disturbance to building users.
The scheme will be competitively tendered through an open tender exercise, and the successful contractor will be chosen based on the most economically advantageous offer to the University of Salford as detailed in the ITT cover letter.
| Supplier | Identifier | Award Value | Lots Won | Cross-References |
|---|---|---|---|---|
| A.T Nolan Building Contractors Limited | 03900077 | - | 1 lot Lot 1 | - |
This procurement was divided into 1 lots, each awarded separately. 9 bids were received in total.
| Lot | Value | Bids Received | Awarded To | Status |
|---|---|---|---|---|
| Lot 1 Jun 2025 – Nov 2025 | - | 9 | A.T Nolan Building Contractors Limited | active |