Our Lady of Peace is a two–form entry Primary School with Nursery provision. The school is a Catholic Voluntary Aided school within the Diocese of Northampton and has close links with the Parish of Our Lady of Peace Church in Burnham.
SBC is looking to split the primary school site into two, creating two school sites instead of one. There are currently 2 main school blocks on the site (as well as various other smaller buildings). The main southern block, smaller buildings and playing fields will house the school currently using the whole site. Therefore, OLOP will go from occupying both main blocks to using only one to the south.
The vacated block, to the north will be converted for use by a special educational needs school as a satellite provision.
The high level brief of works to be carried out have been agreed with the schools and are set out in this document.
The works will be split into phases, those that are required to get the two schools open and operational for 28th August 2025 (Our Lady of Peace) and 30th November 2025 (Arbour Vale Satellite school).
| Supplier | Identifier | Award Value | Lots Won | Cross-References |
|---|---|---|---|---|
| Feltham Construction Ltd | 01987699 | ~£600,000 estimated from lot values | 1 lot Lot LOT-0001 | - |
This procurement was divided into 1 lots, each awarded separately.
| Lot | Value | Awarded To | Status |
|---|---|---|---|
| Lot 1 Jul 2025 – Nov 2025 | £600,000 £751,832 initial term | Feltham Construction Ltd | active |