Transport for London (TfL) has identified that cuttings CTS 7 and CTS 8 between North Acton and Hanger Lane require remedial works to stabilise the cutting.The combined length of the cuttings is approximately 1100m.The assets are susceptible to pore pressure levels (the pressure of groundwater in the soil or rock) and displacements and are considered a high risk.Due to the increased number of prolonged rainfall events over the recent years, soil pore pressure build up has become more common and the asset is at greater risk of failure.In 2017, TfL Engineering produced a detailed design for remediating the asset which consisted of;Discrete Bored PilesDiscrete H-PilesKing Post WallAsset drainageRe-gradingAfter the detailed design was completed, the business decision was to pause the project due to funding constraints faced by the business.Due to the criticality of this asset and the continued deterioration of the cutting, the project has been reinitiated.
| Supplier | Identifier | Award Value | Lots Won | Cross-References |
|---|---|---|---|---|
| SKANSKA CONSTRUCTION UK LIMITED | 00191408 | £20,000,000 | 1 lot Lot 1 | - |
Taken from this notice, not from Companies House. Check the original notice — details change and are not updated here.
This procurement was divided into 1 lots, each awarded separately. 6 bids were received in total.
| Lot | Value | Bids Received | Awarded To | Status |
|---|---|---|---|---|
| Lot 1 Feb 2026 – Mar 2029 | £20,000,000 | 6 | active |
Notices published under the Procurement Act 2023 name every bidder, including unsuccessful ones.
| Bidder | Bid on | Outcome |
|---|---|---|
| SKANSKA CONSTRUCTION UK LIMITED | Lot 1 | Won |
| AMALGAMATED CONSTRUCTION LTD | Lot 1 | Unsuccessful |
| BALFOUR BEATTY RAIL LIMITED | Lot 1 | Unsuccessful |
| CIRCET (UK) LIMITED | Lot 1 | Unsuccessful |
| ENABLE INFRASTRUCTURE LIMITED | Lot 1 | Unsuccessful |
| M Group Transport (Rail and Aviation) Ltd | Lot 1 | Unsuccessful |
Weightings from the notice.
Government spending data: This supplier has received £1,961,675,382 in 5,391 payments (over £25k) from Department for Transport, Ministry of Defence, Department for Education, DfT GPC, Surrey Police and 1 more public bodies (2012-06-14 to 2026-05-18). View full payment history →