Network Rail (“the Authority”) is procuring an end to end Infrastructure Monitoring (IM) solution to replace its life expired dedicated IM fleet and assure the safe, reliable and efficient operation of the Great Britain rail network. The supplier will provide, operate and maintain the assets, systems and services necessary to capture, process, assure and deliver all required IM data streams to Network Rail’s Enterprise Data Platform, in accordance with relevant Measurement Standards and IM Data Specifications, so that the Authority receives the right data, in full and on time, for use by end customers across Regions and Routes.
The solution may combine dedicated IM rolling stock, in service monitoring (on timetabled passenger or freight services) and, where appropriate on a cost–benefit basis, non train borne methods (e.g., Road-Rail Vehicle (RRV)), provided all applicable law, policy and standards are met. The supplier will act as Entity in Charge of Maintenance (ECM), manage obsolescence, ensure approvals for operation on the British network, and deliver services against a jointly maintained Joint Operating Plan. Network Rail will not purchase or own the solution assets.
Core scope of services and outputs
Minimum data streams in scope
Standards, compliance and constraints
Data streams must meet the relevant Measurement Standards and Data Specifications (e.g., NR/L2/TRK series, NR/L2/ELP/27325, NR/L2/TRK/3204, NR/L2/TRK/038, etc.), with delivery frequencies adhering to nominal and maximum intervals defined per track section in the Baseline Coverage Requirements. The solution must comply with applicable law and Railway Group Standards, data protection/security requirements, and environmental/sustainability obligations; emissions reduction (e.g., electric where feasible, electro diesel where necessary) is expected.
Out of scope
Analysis of data beyond the IM Data Specifications, and the operation, maintenance and disposal of the existing IM fleet.
No supplier information available.
This procurement was divided into 1 lots, each awarded separately.
| Lot | Value | Status |
|---|---|---|
| Lot 1 Apr 2027 – Mar 2035 | £1,500,000,000 | active |
Weightings from the notice.