BETAThis is a new independent transparency project, not an official government website. The data is sourced from public registers and may contain errors, so always verify against the official source. If you find a problem, please report it here.
The Clare Glen Bridge Replacement and Enhancement Scheme is to align with Armagh City,
Banbridge & Craigavon Borough Council Plans and Strategy, as set out in MOI Part B.
The Economic Operator shall provide the Services, as developed by the Council, for the demolition and removal of the existing 3 span Glulam timber footbridge, the design of a replacement footbridge and associated works, in addition to the design for the upgrade of
5.5km of park paths including signage upgrades to comply with Councils guidelines and accessible furniture.
The Council wishes to take the project forward, through the appointment of an Integrated
Consultancy Team (ICT) commissioned to define the project brief (RIBA 1) and prepare conceptual designs (RIBA Stage 2), carry out stakeholder consultations. Undertake detailed design, cost exercises and secure necessary planning approvals (RIBA 3) and produce technical designs and IST tender documents to a mid-stage gateway in RIBA Stage 4
| Supplier | Identifier | Award Value | Lots Won | Cross-References |
|---|---|---|---|---|
| Paul McAlister Architects Ltd | NI057749 | £86,712 | 1 lot Lot 1 | - |
Taken from this notice, not from Companies House. Check the original notice — details change and are not updated here.
This procurement was divided into 1 lots, each awarded separately. 8 bids were received in total.
| Lot | Value | Bids Received | Awarded To | Status |
|---|---|---|---|---|
| Lot 1 Jul 2025 – Jul 2027 | - | 8 | Paul McAlister Architects Ltd | active |