Barrington Parish Council (BPC) wishes to replace or refurbish the village hall. The village hall and the land upon which it sits is held in Trust for the village by the Village Hall Trustee (VHT). The building is in poor condition and s106 funds have been allocated for its refurbishment or replacement. It is not a listed building but is a significant feature and located in a prominent position overlooking the Village Green and within the Conservation Area. It is accessed via a permitted accessway across the Village Green under licence from the Green Charity.
Following a detailed options study, BPC now wishes to drive forward with plans for the Village Hall and requires a company that can:
Refurbish
The principle of retaining an existing building wherever possible to avoid wasting carbon and resources points to refurbishment as the starting point for Stage 2 Concept Design. However, as the scheme is developed through Stage 2, the size of the original Hall, its proportion, construction and location on the site may limit flexibility in the emerging design and this needs to be considered.
The original Hall, with refurbished, insulated roof and new rooflights could sit at the heart of a highly insulated new building that could entirely envelop the old Hall, improving its environmental performance and creating welcoming and service space around it as well as extending its length with a secondary smaller hall to the rear. A Structural Report from the Structural Engineer Price & Myers indicates that the existing timber trusses in the Hall can be refurbished with tie rods at a higher level.
Rebuild
Alternatively, given the constraints of the Village Hall site, a new building is likely to be laid out with the two Halls at the heart of a building surrounded by circulation and service space. However, the freedom to change the proportion of the main Hall and its relationship to other parts of the building such as the smaller hall, may ultimately allow the design to be more flexible.
Accommodation Needs
The spatial requirements have been assessed following consultation with users. The total area was fixed at 650sqm in order to compare site layouts but including:
Budget Constraints
The finite amount of funds available means that the work on the village hall needs to be completed within very strict budgetary constraints. For the provision of architectural, surveying, planning, design and project management services a maximum budget of £160,000 is available.
Contract Period
The Services tender request includes whole life project management. The intended contract start and end dates - from the design to handover and sign off of the whole project - are Start date 1.9.25 End date 31.8.27.
No supplier information available.
This procurement was divided into 1 lots, each awarded separately.
| Lot | Value | Status |
|---|---|---|
| Lot 1 Sept 2025 – Aug 2027 | £160,000 | active |