Fire Strategy at Dedworth Middle School.
The removal of floating / fixed condemned Firewall from the hall area.
The creation of compartmentisation with th ereplacement of 30 Fire door sets.
Contingency for asbestos testing and removal if required.
Localised decoration around the areas noted above.
Production and issue of O&M Manuals
FIREDOOR SPECIFICATIONS
Fire doors required:
Area Description
Main Hall Double door set, fire-boarding and decoration
Electrical Cupboard Double door set, fire-boarding and decoration
Year 5 Corridor Double door set, fire-rated surround, and ceiling fire break
Year 8 Corridor Double door set, fire-rated surround, and ceiling fire break
Headteachers Office Single fire door set, over-cladding of glazed area
Planning Room Single fire door set
Meeting Room 2 Single fire door set
5 SLE Room Single fire door set
Room 5 AS Single fire door set
Year 5 LQ Single fire door set
Room 1 Single fire door set
Room 2 Single fire door set
Room 11 Single fire door set
Head of Years Office Single fire door set
Room 9 Single fire door set, over-cladding to head and surround
Deputy Head's Office Single fire door set
Corridor Single fire door set
SKPA Room Single fire door set
Room 8 Single fire door set
Meeting Room Single fire door set
Server Room Single fire door set, fire-board cladding
Small Electrical Cupboard Single fire door set, fire-boarding required
Beside Electrical Cupboard Single fire door set
First Aid Room Single fire door set
School Office Single fire door set
SEN Office Single fire door set
Area Beside the SEN Office Single fire door set
Rear Staff Room Single fire door set
Staff Kitchen Single fire door set, fire-boarding to side panel
Opposite Staff Kitchen Single fire door set
ADDITIONALS
Contingencies and Prelims
Contingency Sum for Fire Alarms, Door Entry & Security Systems
Removal of existing firewall and scaffolding
Provisional sum for Asbestos testing
Repairs to localised decorating around doors
Production and issue of O&M manual
No supplier information available.
This procurement was divided into 1 lots, each awarded separately.
| Lot | Value | Status |
|---|---|---|
| Lot 1 Jul 2025 – Aug 2025 | - | planning |