BETAThis is a new independent transparency project, not an official government website. The data is sourced from public registers and may contain errors, so always verify against the official source. If you find a problem, please report it here.
To refurbish and replace play equipment at Windmill Hill Playpark in Kemble. All new equipment to be housed within the existing footprint.
1. Remove existing swings and dispose. Replace with new 3 bay to consist of: 2 x junior swings; 1 x basket type swing; 2 x infant swings.
2. Refurbish existing junior play tower (see report).
3. Remove for reuse 3 items of wooden trim trail equipment: balance board on springs; climbing ropes on apex frame; balance chain walk (both parts). Remove for disposal old stumps and climbing wall.
4. Install the pieces of wooden trim trail around the perimeter of the green park using new metal post feet.
5. Provide new:
a) Toddler play tower with slide b) All accessible roundabout (not ground sunk) c) Inclusive spinning rope tower (large) d) 4 person see-saw
6. Recommend flooring options with separate pricing.
Open site, can be visited at any time.
No supplier information available.
This procurement was divided into 1 lots, each awarded separately.
| Lot | Value | Status |
|---|---|---|
| Lot 1 May 2025 – Aug 2025 | - | active |