BETAThis is a new independent transparency project, not an official government website. The data is sourced from public registers and may contain errors, so always verify against the official source. If you find a problem, please report it here.
The City and County of Swansea operate a 48 hour pot hole repair project. This requires a proprietary product to be used out of hours in all condition. The Council recognise the advantage of a one stop fix and all repairs permanent first visit. This contract is for the supply of a Permanent Cold Lay Surfacing Material (PCSM) for use on the Highway and other public areas in Swansea. To be delivered to the Highways Deport in Players Industrial Estate Clydach Swansea.
The materials are required to be HAPAS certified PCSM material usable in wet conditions. Products that require a dry surface will not be considered. Products that require a dry surface will not be considered. Material to be available in 25Kg bags in 6mm aggregate. Shelf life to be a minimum of 4 months.
| Supplier | Identifier | Award Value | Lots Won | Cross-References |
|---|---|---|---|---|
| VIATEC (UK) LIMITED | 05642795 | £1 | 1 lot Lot 1 | - |
Taken from this notice, not from Companies House. Check the original notice — details change and are not updated here.
This procurement was divided into 1 lots, each awarded separately. 6 bids were received in total.
| Lot | Value | Bids Received | Awarded To | Status |
|---|---|---|---|---|
| Lot 1 360 days | £1 initial term | 6 | VIATEC (UK) LIMITED | active |
Weightings from the notice.
Government spending data: This supplier has received £4,572 in 7 payments (over £25k) from Forestry Commission GPC (2019-04-10 to 2024-04-25). View full payment history →
Published by the buyer on this notice. Check the original notice — details change and are not updated here.