BETAThis is a new independent transparency project, not an official government website. The data is sourced from public registers and may contain errors, so always verify against the official source. If you find a problem, please report it here.
Last financial year, a large proportion of Tate Modern’s Curatorial budget was spent on alternations of the gallery spaces, mainly dismantling and re-building walls, to suit the layout requirements for each exhibition. This practise also contributes to one of the largest portions of the carbon footprint generated by exhibitions production.
Tate Modern would like to turn this challenge into an opportunity, where we are taking advantage of a completely empty space to design a new gallery that could be adapted for multiple exhibition projects in a low cost and circular way.
This project will commission specialised designers to design a set of modular, movable and re-configurable walls to use in Blavatnik L2 South Gallery. This would allow us to respond to project-specific spatial needs by achieving multiple layouts with flexible setworks, making substantial efficiencies in construction costs, materials, labour and waste.
No supplier information available.
This procurement was divided into 1 lots, each awarded separately.
| Lot | Value | Status |
|---|---|---|
| Lot 1 May 2025 – Mar 2026 | £250,000 | active |
Published by the buyer on this notice. Check the original notice — details change and are not updated here.