OPENTender notice · THAMES WATER UTILITIES LIMITEDRef ocds-h6vhtk-04c0ac
Mains Rehabilitation
Save Track Track buyer
Contract Value
£440,000,000
Procurement
Negotiated procedure with prior call for competition
This procurement was divided into 2 lots, each awarded separately.
Lots
2
Combined Lot Value
£440,000,000
Lot
Value
Status
Lot 1
Lot 1 (Design and Build)
1,440 days (≈3.9 yrs)
£320,000,000
active
Lot 2
Lot 2 (Build Only)
1,440 days (≈3.9 yrs)
£120,000,000
active
Key Dates
Published
20 January 2025
Tender Open
-
Tender Deadline
14 January 2025
Award Date
-
Contract Start
-
Contract End
-
Extension option
Thames Water envisages that the contract will be awarded for an initial term of 4 years with options to extend up to a maximum duration of 8 years.
Notice Amendments
Changes the buyer published to this notice after it first appeared.
Amendment 1
II.1.4 (II.1.4): This project includes, but is not limited to the following packages of work:
A new chemical storage and dosing system to aid Phosphorus removal
A new pre-aeration primary tank supernatant and RAS mixing and distribution chamber
A new activated sludge aeration lane that matches existing with two new 35 m diameter final settlement tanks and RAS system
A new Tertiary Solids Removal treatment stage
A new standby power facility
A new centrate storage tank and pump system to return centrate for treatment
A new Picket Fence Thickener to operate in parallel to two existing units
A new liquor return pump station to return site liquors for treatment → This project includes, but is not limited to the following packages of work:
Optimisation, structural replacement or relining of distribution water mains within DMAs and bounded by district meters and the District Boundary Valves.
· Structural replacement of all service connections from the distribution mains to customer boundaries, including installation of a suitable boundary box.
· Replacement of all apparatus connected to the network including valves, hydrants, disinfection points, air valves, etc.
· Securing abandoned mains by cutting and capping. Removing surface covers, marker posts and plates of abandoned washouts, hydrants and valves etc. so that only covers relating to live apparatus remain.
Amendment 2
Cancelation of lot 2 (II.2.4): Lot 2 - Build Only
Water Quality, Burst Driven, DMA Replacement
NEC4 ECSS Short form with TW Amendments
Optimisation, structural replacement or relining of distribution water mains within DMAs and bounded by district meters and the District Boundary Valves.
Structural replacement of all service connections from the distribution mains to customer boundaries, including installation of a suitable boundary box.
Replacement of all apparatus connected to the network including valves, hydrants, disinfection points, air valves, etc.
Securing abandoned mains by cutting and capping. Removing surface covers, marker posts and plates of abandoned washouts, hydrants and valves etc. so that only covers relating to live apparatus remain. → We would like to inform that the PQQ FA2172 Main Rehab Framework Lot 2 process is being terminated due to a lack of candidates. Lot 2 was structured as a multi-supplier framework with 3 to 5 contractors.
Since we received only one Lot 2 PQQ response it is not possible to proceed at this stage with a tender process for Lot 2 that is consistent with the Contract Notice.
The limited number of submissions received would additionally not provide the necessary competitive environment required to ensure the best value for money.
This decision has been made in accordance with our procurement process, which aims to foster a competitive and fair bidding process.
We believe that re-evaluating the scope of the ITN and possibly re-issuing it at a later date may attract a broader range of suppliers and ensure a more competitive process.
Procurement Details
Method
Selective — suppliers are shortlisted first
Method Details
Negotiated procedure with prior call for competition