BETAThis is a new independent transparency project, not an official government website. The data is sourced from public registers and may contain errors, so always verify against the official source. If you find a problem, please report it here.
NOTE - Reserved Contract
This contract is reserved for SMEs based in Merseyside area of UK
The Project consists of the removal of the existing heating system including pipework throughout Hopkins Hall and replacing the existing radiators with electric panel heaters. The existing boilers and associated plant are being replaced with the installation of 5 Nr Air Source Heat Pumps
No supplier information available.
This procurement was divided into 1 lots, each awarded separately.
| Lot | Value | Status |
|---|---|---|
| Lot 1 Jun 2025 – Aug 2025 | - | active |
Published by the buyer on this notice. Details change and are not updated here.