BETAThis is a new independent transparency project, not an official government website. The data is sourced from public registers and may contain errors, so always verify against the official source. If you find a problem, please report it here.
United Kingdom National Nuclear Laboratory (UKNNL) intends on establishing a DPS route to market for the Operations, Site Work and Facilities Management requirement, across 8 Lots.
Site Preparation
Building and Facility Construction and Maintenance Services
Industrial Production and Manufacturing Services
Heating, Ventilation and Air Conditioning
Mechanical and Electrical, Control and Instrumentation
Hazardous Waste
Asbestos, Waste Removal, Surveys and Remediation
Access, Lifting and Maintenance
Bids are submitted through the buyer’s own portal, not on this site. Check the original notice before relying on any date here.
No supplier information available.
This procurement was divided into 8 lots, each awarded separately.
| Lot | Value | Status |
|---|---|---|
| Lot 1 Site Preparation 720 days (≈2 yrs) | £800,000 | active |
| Lot 2 Building and Facility Construction and Maintenance Services 720 days (≈2 yrs) | £4,000,000 | active |
| Lot 3 Industrial Production and Manufacturing Services 720 days (≈2 yrs) | £2,000,000 | active |
| Lot 4 Heating, Ventilation and Air Conditioning 720 days (≈2 yrs) | £3,000,000 | active |
| Lot 5 Mechanical and Electrical, Control and Instrumentation 720 days (≈2 yrs) | £2,000,000 | active |
| Lot 6 Hazardous Waste 720 days (≈2 yrs) | £1,200,000 | active |
| Lot 7 Asbestos, Waste Removal, Surveys and Remediation 720 days (≈2 yrs) | £1,200,000 | active |
| Lot 8 Access, Lifting and Maintenance 720 days (≈2 yrs) | £800,000 | active |
Changes the buyer published to this notice after it first appeared.
Deadline date amended
Published by the buyer on this notice. Details change and are not updated here.