The detailed element of the application will include the following elements, collectively known as the Phase 1 infrastructure works:
· Delivery of the first phase of the Crawley Western Multi-modal Corridor, a new single carriageway plus dedicated bus lanes, which forms a connection from Charlwood Road to the east and the primary access route to the development
· A Primary Street forming a spine road incorporating primary and secondary street connections, together with parking and loading bays, street lighting and fixtures
· Active travel provision with dedicated cycle ways and footways within the primary street
· Transport Hubs and provision for bus transport with bus stops and bus priority through a bus only connection to Rusper Road in the east
· Bridge crossing of the River Mole
· Site clearance and enabling works, including utilities diversions
· Utilities, surface and foul drainage infrastructure to service the planned development plot.
· Proposed foul pumping station and connection to existing trunk sewer
· Landscape works incorporating SuDS corridors, flood mitigation features, ecological mitigation and enhancement and noise mitigation
· Local amendments to existing public rights of way
Please note, the deadline has been extended to 15 October 2024 at 17:00.
The address has been changed in this notice as Homes England's head office has now moved.
No supplier information available.
This procurement was divided into 1 lots, each awarded separately.
| Lot | Value | Status |
|---|---|---|
| Lot 1 | - | planned |
Changes the buyer published to this notice after it first appeared.
Published by the buyer on this notice. Details change and are not updated here.