Kishorn Port Limited own and operate the Dry Dock facility at Kishorn. The existing Dry Dock is to be enlarged by forming a cutting 100m long and 60m wide into the rock foreshore. The rock material blasted and removed will be used to reclaim 8.5 hectares of foreshore land to the east of the Dry Dock. Access roads are to be repositioned around the new works. The Contractor will design the blasting elements of the Works. In support of its ongoing operations, KPL is engaging in market research with a view to launching a competitive tender process for works associated with the East Reclamation and Dry Dock Enlargement at a later date for the award of a contract.
No supplier information available.
This procurement was divided into 1 lots, each awarded separately.
| Lot | Value | Status |
|---|---|---|
| Lot 1 | - | planned |