The University intends to reconfigure space in Galashiels, currently shared between Scottish Borders Campus main building and The High Mill Building. The University intends to locate all learning, teaching, research, and support space to the High Mill Building. This intent will require existing space to be creatively redesigned for flexible and multi-purpose use.
No supplier information available.
This procurement was divided into 1 lots, each awarded separately.
| Lot | Value | Status |
|---|---|---|
| Lot 1 Sept 2024 – Sept 2027 | - | active |