BETAThis is a new independent transparency project, not an official government website. The data is sourced from public registers and may contain errors, so always verify against the official source. If you find a problem, please report it here.
Wimbledon Depot Technical Resource
To be responsible for the maintenance, repair of SWR rolling stock, including the testing of
HVAC and sanding systems, testing of components and equipment in accordance with South
Western Railway specifications as required. The holder will adhere to local instructions, safety, quality and environmental procedures, rules and regulations in force.
Daily activities include (but are not limited to):
12 staff in total
All MB3 (or equivalent)
Require a Project manager / supervisor that controls the staff and liaises with SWR PM
Shift pattern to be 4 on 4 off rotating days and nights 12 hours shifts 07:00 - 19:00, 19:00 -
07:00
No supplier information available.
This procurement was divided into 1 lots, each awarded separately.
| Lot | Value | Status |
|---|---|---|
| Lot 1 240 days | - | active |
Changes the buyer published to this notice after it first appeared.
Removal of 'requirement for a Project manager / supervisor that controls the staff and liaises with SWR PM'
Included reference to Class 455 fleet.
Revised scope of requirements as follows;
Wimbledon Depot Technical Resource
To be responsible for assisting with the maintenance and repair of SWR Class 455 electric multiple units , in accordance with South Western Railway specifications as required. The holder will adhere to local instructions, safety, quality and environmental procedures, rules and regulations in force.
Daily activities include (but are not limited to):
12 staff in total
All to be competent rolling stock technicians (mechanical or electrical)
Shift pattern to be 4 on 4 off rotating days and nights 12 hours shifts 07:00 - 19:00, 19:00 - 07:00
Published by the buyer on this notice. Check the original notice — details change and are not updated here.