BETAThis is a new independent transparency project, not an official government website. The data is sourced from public registers and may contain errors, so always verify against the official source. If you find a problem, please report it here.
Penzance Dry Dock (PDD) is famously steeped in history, currently being the oldest operational dry dock of its type in Europe but requires drastic investment after decades of neglect and dilapidations. While the surrounding shipyards, across the county and country have seen investment, PDD has slipped through the net time and time again.
PDD plans to complete a large refit by March 2025. PDD will become the engineering powerhouse that it once was, but with more abilities than ever before. This facility has primally been ship repair only, but now we are supporting multiple areas of the market, ship repair, ship building, mass fabrication and most importantly training and skill development.
This capital investment, part-funded by the UK Government through the UK Shared Prosperity Fund, will see the site brought up to an even playing field with the rest of industry, with new, safer lifting systems and the dilapidations being rectified. We will see our efficiency drastically increased which in turn will assist in reducing our carbon footprint.
As part of this refit, PDD wishes to purchase 6 cranes:
Goliath x1
Gantry (x4 - two 10T cranes per bay)
Quayside Jib Crane x1
PDD will supply:
The successful tenderer shall provide all consumables, raw materials, PPE and labour to fabricate the cranes.
More details in the here:
https://www.contractsfinder.service.gov.uk/Notice/b600f258-0ad1-4314-8783-a56150ff75d6
No supplier information available.
This procurement was divided into 1 lots, each awarded separately.
| Lot | Value | Status |
|---|---|---|
| Lot 1 | £940,000 | active |
Published by the buyer on this notice. Check the original notice — details change and are not updated here.