Following the completion of the construction base-build works, the Exhibition Fit-Out Contractor will be responsible for the construction and installation of all setworks, specialist joinery items, props and physical interactives. Installation of data cables and purchase and installation/commissioning of AV hardware including programming and commissioning of show-control; media will be provided and commissioned by others. The Exhibition Fit-Out contractor will also be responsible for Artworking, production and installation of graphics, and the purchase and installation of exhibition lighting. The fit-out contractor will also be responsible for liaising and fully coordinated construction drawings with the display case and AV software contractors.
The exhibition fit-out works will focus on the following areas of the museum building: Welcome & Shop (G.01 & G.02); the Central Court and mezzanine (G17, G.35 & 1.07); Guard Room (G.36)l; the Football Museum galleries (1.01 & 1.22) and the Wrexham Museum galleries ( 1.02, 1.04.105,1.06, 1.10, 1.11 & 1.41) (For room locations – see attached drawings)
No supplier information available.
This procurement was divided into 1 lots, each awarded separately.
| Lot | Value | Status |
|---|---|---|
| Lot 1 | - | planned |