The Dynamic Purchasing System (DPS) will provide a list of potential providers considered capable of carrying out multi-utility connection and renewable technology works to a satisfactory standard. The nature and types of services that may be required may include, but are not limited to, those services identified by the CPV code and summarised in section II.2.
No supplier information available.
This procurement was divided into 8 lots, each awarded separately.
| Lot | Value | Status |
|---|---|---|
| Lot Lot 1: Multi-Utility Connections – Increase or Decrease in Capacity Lot 1: Multi-Utility Connections – Increase or Decrease in Capacity 1,440 days (≈3.9 yrs) | £400,000,000 | active |
| Lot Lot 2: Gas (New Connections, Modification and Disconnections) Lot 2: Gas (New Connections, Modification and Disconnections) 1,440 days (≈3.9 yrs) | £400,000,000 | active |
| Lot Lot 3: Electricity (Electrical Connections and Disconnections, Industrial, Domestic and Building Sit Lot 3: Electricity (Electrical Connections and Disconnections, Industrial, Domestic and Building Site Connections) 1,440 days (≈3.9 yrs) | £400,000,000 | active |
| Lot Lot 4: Water (New Connections and Disconnections) Lot 4: Water (New Connections and Disconnections) 1,440 days (≈3.9 yrs) | £400,000,000 | active |
| Lot Lot 5: Telecoms Ducting and Arrangement of Private Networks Lot 5: Telecoms Ducting and Arrangement of Private Networks 1,440 days (≈3.9 yrs) | £400,000,000 | active |
| Lot Lot 6: Street Lighting Installation and Connection Lot 6: Street Lighting Installation and Connection 1,440 days (≈3.9 yrs) | £400,000,000 | active |
| Lot Lot 7: District Heating Connections, Modification and Disconnections Lot 7: District Heating Connections, Modification and Disconnections 1,440 days (≈3.9 yrs) | £400,000,000 | active |
| Lot Lot 8: EV Charging, Solar, Wind, Energy from Waste, Biomass and Combined Heat and Power Connections Lot 8: EV Charging, Solar, Wind, Energy from Waste, Biomass and Combined Heat and Power Connections 1,440 days (≈3.9 yrs) | £400,000,000 | active |