Access & Insulation Services provide key support activities to the effective management and maintenance of the Magnox Ltd assets and in support of project delivery.<br/>Access services include the Provision of all access requirements to enable Magnox Ltd site and programme staff and Suppliers to gain access to various locations at each of their facilities for the purposes of modification, maintenance and inspection works on items of plant, equipment and buildings.<br/><br/>Insulation Services include the removal of any asbestos containing materials including thermal insulation (the methods employed will be varied and will include traditional methods and complete asbestos coated component removal, re-application of insulation as required and removal of wastes (hazardous and non-hazardous).<br/>Additional service will also be required in the provision of industrial support services to include but not limited to: crane & equipment hire, industrial coating and painting, building cladding and minor civil works.<br/><br/>It is anticipated that the contract will be placed as a 4 year Framework with the services being split into 2 separate lots based on geographical split of Magnox Sites based on a Northern-Eastern Lot and A South-Southwest Lot.<br/><br/>This contract notice requires Tenderers to complete their response to the Prequalification Stage only. Tenderers responses to the Tenderer Selection Criteria will be assessed as detailed in the tender pack available free of charge at the aforementioned address. Only Tenderers who are successful during the Prequalification Stage as per the tender documents will then be invited to submit a full tender response for the Invitation to Tender stage.
No supplier information available.
This procurement was divided into 1 lots, each awarded separately.
| Lot | Value | Status |
|---|---|---|
| Lot 1 1,440 days (≈3.9 yrs) | £65,000,000 | active |
Changes the buyer published to this notice after it first appeared.
Magnox Ltd (Mx) is responsible for the following sites, which are owned by the Nuclear Decommissioning Authority (NDA):Berkeley, Bradwell, Chapelcross, Dungeness A, Harwell, Hinkley Point A, Hunterston A, Maentwrog (Hydro), Oldbury, Sizewell A, Trawsfynydd, Winfrith, WylfaThe strategic purpose for Mx is to create a clean and safe environment for future generations, in support of the NDA’s mission of delivering safe, sustainable, and publicly acceptable solutions to the challenge of nuclear clean-up and waste management.Mx will also have responsibility the decommissioning of EDF AGR sites, specifically Hunterston B and Hinkley Point B which will transfer to Mx control, the framework contracts will include the provision of A&I services to these sites.Dounreay a division of Magnox Limited, currently has in place its own supply chain arrangements for the provision of elements of the planned framework scope and participation in this framework for Dounreay is optional.