BETAThis is a new independent transparency project, not an official government website. The data is sourced from public registers and may contain errors, so always verify against the official source. If you find a problem, please report it here.
Transport Scotland, on behalf of the Scottish Ministers, has identified the need to establish a Multiple Supplier Framework Agreement. This Multiple Framework Agreement for Asset Management Technical Services covers services crucial to allowing Transport Scotland to meet statutory, legal and contractual obligations and aimed at driving continuous improvement in how we manage and analyse Scottish Trunk Road asset data. The services consider national standards and codes of practice, maintenance processes/procedures, asset performance and budget assignment to deliver value for money and innovation.
The Framework will consist of four Lots covering:
1) Asset Management Improvement Programme (AMIP) Lot which will include lifecycle planning; network resilience; scheme identification, prioritisation and optimisation; updates to road asset management policy, strategy and planning; information management; performance management as well as staff support and training.
2) Asset Management Performance System (AMPS) Development and Maintenance Lot. AMPS is an existing IT management and service delivery tool that is essential to the effective management and maintenance of the Scottish trunk road network and the delivery of the Operating Company Contracts. The service will through its lifetime require development and maintenance in order to improve functionality aimed at driving future improvements in Transport Scotland’s asset management practices through improved analytical capabilities and fully integrated management tools that deliver value for money solutions.
3) Geotechnical Certification Services Lot. The principal services shall comprise the provision of an independent geotechnical services for the certification of ground investigations, geotechnical design and other geotechnical activities related to the Scottish Trunk Road network. This shall include both the performance of the service and the provision of advice in relation to the service. In addition the services shall comprise providing advice in relation to technical specifications or publications. Other geotechnical-related services may be required to be undertaken from time to time, including similar services related to railway and other transport infrastructure.
4) Asset Management Technical Advice Lot. This will cover Design Standards and Professional Services which covers the review and provision of advice in relation to Departures from Standards including the Design Manual for Roads and Bridges (DMRB), Manual of Contract Documents for Highway Works (MCHW), and all other Transport Scotland and UK wide Design Guidance and Technical Documents (or an equivalent to each of these documents). In addition this Lot will cover Transport Research to enable research and development work to deliver improvements in safety, construction, operation, and maintenance of the Scottish road network.
The proposed framework will be in place for a period of 4 years.
| Supplier | Identifier | Award Value | Lots Won | Cross-References |
|---|---|---|---|---|
| AECOM | - | - | 1 lot Geotechnical Design Certification Services | - |
| Amey OW Ltd | - | - | 1 lot Geotechnical Design Certification Services | - |
| Arcadis | - | - | 1 lot Asset Management Performance System (AMPS) Development and Maintenance | - |
| AtkinsRéalis UK Limited | - | - | 2 lots Asset Management Improvement Programme · Asset Management Performance System (AMPS) Development and Maintenance | - |
| Jacobs U.K. Limited | - | - | 1 lot Asset Management Technical Advice | - |
| Mott MacDonald Limited | - | - | 2 lots Asset Management Improvement Programme · Asset Management Performance System (AMPS) Development and Maintenance | - |
| Ramboll UK Ltd | - | - | 1 lot Asset Management Technical Advice | - |
| WSP UK Limited | - | - | 3 lots Asset Management Improvement Programme · Geotechnical Design Certification Services · Asset Management Technical Advice | - |
Taken from this notice, not from Companies House. Check the original notice — details change and are not updated here.
This procurement was divided into 4 lots, each awarded separately. 17 bids were received in total.
| Lot | Value | Bids Received | Awarded To | Status |
|---|---|---|---|---|
| Lot 1 Asset Management Improvement Programme 1,440 days (≈3.9 yrs) | £2,400,000 initial term | 4 | Mott MacDonald Limited AtkinsRéalis UK Limited WSP UK Limited | active |
| Lot 2 Asset Management Performance System (AMPS) Development and Maintenance 1,440 days (≈3.9 yrs) | £4,000,000 initial term | 3 | AtkinsRéalis UK Limited Mott MacDonald Limited Arcadis | active |
| Lot 3 Geotechnical Design Certification Services 1,440 days (≈3.9 yrs) | £3,000,000 initial term | 5 | AECOM Amey OW Ltd WSP UK Limited | active |
| Lot 4 Asset Management Technical Advice 1,440 days (≈3.9 yrs) | £3,200,000 initial term | 5 | WSP UK Limited Jacobs U.K. Limited Ramboll UK Ltd | active |
Weightings from the notice, applied to every lot.
Published by the buyer on this notice. Check the original notice — details change and are not updated here.