This project will replace the primary and secondary air handling units and will require navigating the complexity of a historic building with potential asbestos risks. This will include all associated plant and equipment within the confines of the air handling unit plant rooms such as, chilled water pipework, low temperature hot water pipework, building management main control panels and field devices, plant room ductwork distribution systems, ductwork ancillaries such as attenuators, fire dampers, volume control dampers, and all associated building work.
No supplier information available.
This procurement was divided into 1 lots, each awarded separately.
| Lot | Value | Status |
|---|---|---|
| Lot 1 1,080 days (≈3 yrs) | £7,488,000 | active |