GTR is seeking Contractors to undertake reactive maintenance, planned preventative maintenance and statutory inspections at depots, stations, office facilities, train crew accommodation and other locations in line with the Network Rail Access Conditions and to SFG20 specification where relevant. GTR’s requirement is divided into two lots as specified below: •Lot 1: Fleet Infrastructure Depots and Sidings Maintenance •Lot 2: Stations, Offices and Welfare Sites Facilities Maintenance Bidders are welcome to tender for one or both Lots, either as separate contracts, or as a combined contract. The mechanism that determines who the winning bidder is for each Lot will be set out at tender stage.
| Supplier | Identifier | Award Value | Lots Won | Cross-References |
|---|---|---|---|---|
| Hollywell Building Services Limited | 02858442 | ~£108,000,000 estimated from lot values | 2 lots Fleet Infrastructure Depots and Sidings Maintenance · Stations, Offices and Welfare site Facilities Maintenance | - |
This procurement was divided into 2 lots, each awarded separately. 8 bids were received in total.
| Lot | Value | Bids Received | Awarded To | Status |
|---|---|---|---|---|
| Lot 1 Fleet Infrastructure Depots and Sidings Maintenance 1,560 days (≈4.3 yrs) | £15,000,000 £50,000,000 initial term | 1 single bid — no competition | Hollywell Building Services Limited | active |
| Lot 2 Stations, Offices and Welfare site Facilities Maintenance 1,560 days (≈4.3 yrs) | £39,000,000 £100,000,000 initial term | 3 | Hollywell Building Services Limited | active |