National Grid Electricity Transmission PLC (NGET) and SP Transmission PLC (SPTN) (the "Employers") are jointly developing a HVDC link between Torness, Scotland and Hawthorn Pit, England (the "HVDC Link"). This notice concerns the award of one or more Engineering, Procurement & Construction (EPC) contracts for the detailed design, engineering, procurement, manufacture, installation, construction, testing, commissioning, spares provision, operational hand-over and maintenance of the HVDC Link between Scotland and England.
| Supplier | Identifier | Award Value | Lots Won | Cross-References |
|---|---|---|---|---|
| GE Vernova & Mytilineos | - | ~£444,000,000 estimated from lot values | 1 lot EPC of HVDC Voltage Source Commutated (VSC) converter stations at both Torness & Hawthorn Pit and HVAC underground cable at Hawthorn Pit between Converter Station and Point of Common Connection (PCC) | - |
| Mytilineos | - | ~£444,000,000 estimated from lot values | 1 lot EPC of HVDC Voltage Source Commutated (VSC) converter stations at both Torness & Hawthorn Pit and HVAC underground cable at Hawthorn Pit between Converter Station and Point of Common Connection (PCC) | - |
| Prysmian Powerlink SRL | - | ~£480,000,000 estimated from lot values | 1 lot EPC of HVDC submarine and underground cable between converter stations (Torness & Hawthorn Pit) inc. HVAC underground cable at Torness between converter station & Point of Common Connection (PCC). | - |
This procurement was divided into 3 lots, each awarded separately.
| Lot | Value | Awarded To | Status |
|---|---|---|---|
| Lot 1 EPC of HVDC Voltage Source Commutated (VSC) converter stations at both Torness & Hawthorn Pit and HVAC underground cable at Hawthorn Pit between Converter Station and Point of Common Connection (PCC) 1,440 days (≈3.9 yrs) | £444,000,000 | GE Vernova & Mytilineos Mytilineos | active |
| Lot 2 EPC of HVDC submarine and underground cable between converter stations (Torness & Hawthorn Pit) inc. HVAC underground cable at Torness between converter station & Point of Common Connection (PCC). 1,440 days (≈3.9 yrs) | £480,000,000 | Prysmian Powerlink SRL | active |
| Lot 3 A single contract (Turnkey) 1,440 days (≈3.9 yrs) | £924,000,000 | - | active |
Published by the buyer on this notice. Check the original notice — details change and are not updated here.