The works are the replacement of the existing cable and distribution board, with the cable taken from the main incoming 'non-Essential' side switch gear, along the north western part of the site, down to the Watchtree Visitor / Management Centre, coming in where the existing distribution board exists. This will be directly laid within an excavation.
| Supplier | Identifier | Award Value | Cross-References |
|---|---|---|---|
| Mitie FM | 03253304 | £127,274 | - |