These works have been broken down into 4 different work packages, they include: -
Package 1- Kingsway Box Sewer Works
⢠Undertake localised concrete repairs to the covered approaches (where necessary).
⢠Mortar repair to brickwork
⢠Removal of vegetation growth from the structure.
⢠Cleaning and repainting of the protective paint coating to the surface of the Gatic cover beams.
Package 2- Covered Approaches - Repairs
⢠Undertake localised concrete repairs to the covered approaches (where necessary).
⢠Remove of vegetation growth from the structure.
⢠The raking out and replacement of the expansion joint sealant.
⢠The further investigation of the water ingress at vent shaft VS11 in the Liverpool Covered Approach.
⢠Remove all temporary access systems and support structures and make good the existing structure.
Package 3- Covered Approaches- Painting
⢠Undertake localised cleaning of all concrete members via hand scraping and
⢠pressure washing to remove existing anti-carbonation coating.
⢠Painting of new anti-carbonation coating to covered approaches.
Package 4- Retaining Walls and Overbridges
⢠Extension of outfall pipes.
⢠Replace missing bolt to infill mesh.
⢠Replacement of a failed manhole.
⢠Make safe exposed electrical cables.
⢠Re-bed dislodged copings.
| Supplier | Identifier | Award Value | Cross-References |
|---|---|---|---|
| Eric Wright Civil Engineering Ltd | 02565379 | £250,000 | - |
Government spending data: This supplier has received £1,390,254 in 28 payments (over £25k) from Greater Manchester Combined Authority, Department for Transport (2014-11-03 to 2024-05-16). View full payment history →