Works to cover the installation connections for load bank and temporary generator provision on ENT LV generators 5 & 6. The project will be undertaken whilst the standby generators are available to take essential loads in the event of a mains failure to site. The works therefore need not be phased and works undertaken in parallel to existing system. at Bradford Royal Infirmary.
Additional information: The contracting authority considers that this contract may be suitable for economic operators that are small or medium enterprises (SMEs). However, any selection of tenderers will be based solely on the criteria set out for the procurement.