Full details at:
www.ludgvan.org/quotes-invited-repairs-to-chapel-building-crowlas-cemetery/
Preparation phase
1. Construction of buried stormwater drainage soakaway. To bring run-off water from the roof away from the building, by a gulley at each side of the parking area. 100mm underground sewerage pipe.
2. Construction of parking area. To incorporate the soakaway and a turning area. To be surfaced with compacted 803 aggregate and a surface dressing of gravel.
Main phase works:
External structure
Chapel roof
Lean-to building
Internal walls - the existing lime plaster to be removed and replaced with new lime plaster.
Internal floor - replace concrete slab inside entrance.
Additional information: Applications to be submitted by email to …@ludgvan.org.uk by 29 April 2022