Design of: -
1. Evaluation of existing slope stability and stabilisation solutions (netting and anchors);
2. Detailed methodology for tree felling along steep incline slopes, whilst maintaining slope stability;
3. Specification of both temporary and permanent slope stabilisation solutions;
4. Specification of both temporary and permanent surface water management solutions;
5. Temporary works (platforms and roads to allow timber extraction);
6. Ecology (surveys, watching brief; potential liaison with Nature Scotland);
7. Liaison with stakeholders (DIO, MOD, FLS; Argyll & Bute Council; SEPA) as required;
8. Provide ongoing Engineering support/overview during the construction phases;
9. Provide gateway reports at end of each design and construction phases;
10. Provide detailed completion report at end of the works with any further future recommendations.