A call-off from Lot 1 of the Generation 5 Civil Engineering, Highways & Transportation Collaborative Framework 2024 - 2028 (award notice published 01 February 2024).
Provision of a footpath to HCC standard specification as shown on drawing HCC11/C/045B type 1A, comprising a 3m wide main route approx. 198m long and a 2m wide spur route approx. 25m long. The works will include removal of the existing footpath in the open space between the scheme extents and landscaping. Ducts for a future street lighting system will be installed, the lighting system being installed after the main construction phase with no overlap between the works and the street lighting installation activity.
The works also includes the setting up, maintenance and dismantling of arrangements related to a temporary pedestrian diversion which is required to allow the works to be constructed.
| Supplier | Identifier | Award Value | Cross-References |
|---|---|---|---|
| Rocon Contractors Limited | 00732319 | £106,108 | - |
Government spending data: This supplier has received £55,051 in 4 payments (over £25k) from Hampshire & Isle of Wight Constabulary (2015-08-07 to 2024-05-13). View full payment history →