The Contractor will undertake 100% inspection and testing (as far as reasonably practicable as defined in EaWR 1989) of the fixed wiring installation for the specific premises. Test all electrical equipment from incoming source to final point of usage generally in accordance with BS7671:2018 and IET Guidance Note 3, this will include electrical equipment that is part of the fixed electrical installation, i.e. lighting & small power, supplies to fixed equipment, low voltage cables emanating from Substations, where applicable, MCCs and Control Panels.