BETAThis is a new independent transparency project, not an official government website. The data is sourced from public registers and may contain errors, so always verify against the official source. If you find a problem, please report it here.
Mace Dragados require a specialist supplier to design, manufacture and install a six storey 6000m2 site office and accommodation building. The building shall be installed in the vicinity of the Euston Station work site in London. It shall be of a modular construction and requires the following in addition to standard fit out of office and welfare areas:
The Supplier must have experience of supplying >5 storey modular buildings of a similar scale on large major infrastructure projects and complex congested Central London sites.
If successful selected suppliers will be required to go through Mace Dragados pre-qualification process to be included on the final tender list.
Mace Dragados have been appointed as the Construction Partner to build a fully-integrated HS2 station at London Euston, together with links to the existing London Underground station.
HS2 Phase One includes construction of a new railway line run from London Euston to new stations at Old Oak Common in West London, an Interchange Station near Birmingham Airport and the National Exhibition Centre (NEC) and a terminus station in Birmingham City Centre (Curzon Street).
No supplier information available.