A call-off from Lot 1 of the Generation 4-TWO 2020-2024 Civil Engineering, Highways & Transportation Collaborative Framework (awarded 06 March 2020).
The Works comprise of the realignment of Blackbushes Road to tie into the south side of the existing Hartford Bridge Flats roundabout on the A30. A new section of carriageway approximately 240m in length will be constructed between the roundabout and Blackbushes Road, with the redundant road being perforated and covered in site won topsoil, heathland shrub, and brash. A drainage ditch will be constructed adjacent to the new section of road and a security fence installed along the new highway boundary.
| Supplier | Identifier | Award Value | Cross-References |
|---|---|---|---|
| MILDREN CONSTRUCTION LIMITED | 02136748 | £1,146,070 | - |
Government spending data: This supplier has received £449,601 in 4 payments (over £25k) from Department for Transport (2018-10-11 to 2018-12-18). View full payment history →