Mace Dragados require a temporary pedestrian footbridge at the HS2 Euston Station site in London. The required works are detailed within the attached Scope of Works and comprise the design, fabrication, and installation of the footbridge across the basement area of the former two towers site outside the existing Euston Station.
Phase 1 involves the installation of the footbridge to suit the existing ground level on pad foundations. The footbridge will then need to be taken down (and stored on site or removed) whilst the reduced level dig is completed to the required foundation level and then reinstalled on plunge columns.