Carry out the isolation and disconnection of hot and cold water services to 9no. water sink/trough.
(Due to there being no access to the existing sensor taps under the pre-built water sink/trough we will
Have to disconnect and remove the trough to allow the removal of the new taps.)
Carry out the installation of 23 no. Non concussive Taps
Re install Sink/trough after new taps are installed, Re seal sink/trough with silicon
Carry out the alterations to the pipework and carry out installation of new blended water float to each tap.
Remove cabling and dart valley sensor equipment from under each sink/trough
Check and test
| Supplier | Identifier | Award Value | Cross-References |
|---|---|---|---|
| CME Heating | 05417805 | £12,000 | - |