A Contract has been appointed to design, supply, install and handover a physical speed prevention system that will be installed on high risk locations on the London Tram Network. The system will be SIL2 rated and had been procured to prevent any overturning events on the network.
| Supplier | Identifier | Award Value | Cross-References |
|---|---|---|---|
| Engineering Support Group Ltd, | 03038421 | £3,067,000 | - |