Install an 11Kv ring main down the western flank of Culham Science Centre, enabling works are required to excavate the trench, install a sand surround and tiles, and then backfill the trench once the infrastructure is installed.
| Supplier | Identifier | Award Value | Cross-References |
|---|---|---|---|
| Mildren Construction Ltd | 02136748 | £158,042 | - |