Supply of a suitable electric submersible pump to be installed within the top of a coaxial system that is due to be installed in the deep geothermal well EG-1 at the Eden Project. The pump will be attached to 3½" EUE tubing and installed at a depth of approximately 250-300 metres within 7" tubing and will be used to extract hot water from the tubing, which is open-ended and runs to a depth of ~3,800 metres.
.
The coaxial tubing is scheduled to be run in early February 2023 and we wish the pump to be installed simultaneously or as soon as possible thereafter, with the aim to commence production of hot water by spring 2023.
.
The successful contractor will supply and deliver the submersible pump as described in the specification in the tender documents, and will send an engineer to supervise installation and commissioning.
.
Please note tender documents are NOT available on this tendering portal but should be downloaded at https://www.edengeothermal.com/work/supply-of-an-electric-submersible-pump-for-a-coaxial-system/