BETAThis is a new independent transparency project, not an official government website. The data is sourced from public registers and may contain errors, so always verify against the official source. If you find a problem, please report it here.
UKAEA wants to identify and partner with Consultant(s) to develop conceptual designs for the breeder blankets of a fusion power plant.
Identified Consultant(s) would develop conceptual designs for fusion Breeder Blankets, which are critical systems for future fusion power plants. This system plays an important role in the fuel and thermal cycles of fusion power plants.
Breeder Blankets generate fusion fuel and useful heat, which is transferred to the circulated coolant. In many cases this is pressurised and places large loads onto the Breeder Blanket structure.
Consultant(s) are requested to submit proposals that address structural and thermal design challenges, applying their expertise to either improve performance, manufacturability and/or Technology Readiness
| Supplier | Identifier | Award Value | Cross-References |
|---|---|---|---|
| Assystem Energy & Infrastructure Limited | 03148098 | ~£151,015 estimated from lot values | - |
| ESTEYCO S.A. | - | ~£151,015 estimated from lot values | - |
| IDOM Consulting | - | ~£151,015 estimated from lot values | - |
| Wood Nuclear Limited | 01120437 | ~£151,015 estimated from lot values | - |
Government spending data: These suppliers have received £14,868,233 in 126 payments (over £25k) from Ministry of Defence, BEIS, DEFRA (2016-09-30 to 2026-03-24).