To install electrical supplies for 11 new 22Kw (32A three phase single socket or 63A three phase double socket) Rolec electric vehicle charging sockets at 7 locations across the University sites.
The units must be IP65 rated, include MID-approved energy metering, GSM connectivity and be commissioned by a Rolec approved Installer.
A 3-year Rolec Approved maintenance agreement is to be included to run into conjunction with the warranty.
LJMU will raise any ongoing rental costs for software and GSM devices separately with Rolec.
4x sockets (2x double 3 phase Basiccharge units) at LJMU Byrom Street Campus. (Service road).
2x sockets (2x single 3 phase Securicharge units) at LJMU Byrom Street Campus. (Next to POD).
4x sockets (2x double 3 phase Basiccharge unit) John Foster Building Modular Building.
4x sockets (2x double 3 phase Basiccharge units) John Foster Building Catering dept.
2x sockets (1x double 3 phase Basicharge unit) John Lennon Art and Design Building.
Additional information: Please do not send emails direct to the Buyer - all queries must be sent via In-tend - https://in-tendhost.co.uk/ljmu/aspx/Home
We will not respond to direct emails / tel calls