The footbridge previously present at this location has already been removed after having been washed off its footings after bank erosion. The height of the soffit above invert of the original bridge was 600mm.
The footpath at this location is WG 16/33.
These works are to include:
⢠Provision of photographic condition survey of bridge area and proposed access routes.
⢠Install new standard concrete pads.
⢠Collect steel frame from SC depot and install 1No.
10.5m span standard steel framed/timber clad footbridge with deck level with surrounding area.
⢠Install steps either side of bridge with timber handrails.
⢠Install gates at either end of bridge.