Kilnbridge have secured the HS2 Old Oak Common Station Works Package WP10.2 for Fit-Out of the Portal and Ancillary Buildings. Those buildings include the following:
⢠South Portal
⢠DNO Substation
⢠West Core
⢠East Core
⢠North Portal
⢠Train Crew & Catering Building
⢠Cycle Hub
⢠Security Booth
The package includes a range of Multiple services:
⢠Painting & decorating (Soffits, walls, floors)
⢠FF&E of Offices
⢠kitchenettes cupboards
⢠Sanitaryware
⢠IPS units
⢠Ceilings
⢠Tiling walls
⢠Flooring finishes
⢠Screed
The Sub subcontract works includes the provision of all necessary People, Equipment, Plant and Materials for manufacture, supply and testing (if req'd).
The Subsubcontractor will be responsible for progressing the schedule and associated detailed drawings for manufacture and installation. This will require submission to, and acceptance from, the Subcontractor, the Contractor's representatives and the Employer to ensure the provided Sub subcontractors design satisfies the intent prior to construction. All in accordance with the Contractors design procedure and technical assistance requirements.
Expected Subsubcontract award TBC
Construction is to be carried out over a 2.5-year period commencing in Q1 2026 and completing in late Q2 2028. Multiple visits will be required over this period.