BETAThis is a new independent transparency project, not an official government website. The data is sourced from public registers and may contain errors, so always verify against the official source. If you find a problem, please report it here.
This project comprises of various masonry repairs to Crook O'Lune Bridge. Refer to SL364-S1.1.1 Outlined Description of Works included within Schedule 1 - Scope.
Crook O'Lune bridge is a Grade II* listed structure which carries pedestrian and vehicular traffic on the U5295 over the River Lune near Beck Foot
The Contractor shall undertake the role of Principal Designer & Principal Contractor and fulfil their obligations in accordance with CDM 2015.
The Contractor shall be responsible for preparing and obtaining acceptance of all the relevant documentation so that the Client meets all legal requirements, including but not limited to, environmental permitting consent, listed building consent, Temporary Traffic Regulation Orders and Streetworks permits, and other written schemes. The Contractor should consider the application period required for obtaining the relevant documentation. The Contractor will be required to undertake the role of Principal Designer & Principal Contractor and fulfil their obligations in accordance with CDM 2015.
The Contractor shall design the permanent repair works, taking into account the required design period.
The Contractor shall design and check temporary works as required e.g. provision of pontoon systems or bespoke scaffolding. The Contractor should consider the design period required.
| Supplier | Identifier | Award Value | Cross-References |
|---|---|---|---|
| Metcalfe Plant Hire Limited | 02093086 | £50,390 | - |
Government spending data: This supplier has received £3,899,766 in 122 payments (over £25k) from Forestry Commission, Cumbria Constabulary, Forestry Commission GPC (2018-01-11 to 2026-02-26). View full payment history →